Project Details
- Client: Rosan Contracting Co.
- Location: East Gate, Riyadh, Saudi Arabia
- Industry: Mining and Mineral Resources Management
- Project Type: Instructions by the Ministry of Mining. To weigh moving sand & stones
Client Background
The Ministry of Industry and Mineral Resources in Saudi Arabia oversees the country’s mining activities. This includes establishing regulations for mineral extraction, designating mining areas, issuing licenses, and ensuring compliance with environmental standards. The ministry plays a crucial role in managing the sustainable use of mineral resources in the region.
Equipment Specifications
- Project Type: Heavy-Duty Industrial Weighbridge
- Weighing Indicator: HIRS-A6
- Load Cells: CR-05/40ton. Compressor
- Software: Weighing and traffic control software for efficient operations
- Capacity: 100 tons
Objectives and Challenges
The primary goal of the project was to install a robust and precise weighing system capable of handling large volumes of sand and stones. Key challenges included:
- Accuracy: Ensuring precise weight measurements to avoid discrepancies.
- Integration: Seamlessly integrating the new weighbridge with existing logistics systems.
- Environmental Conditions: Operating effectively in harsh environmental conditions typical of mining sites.
- Timelines: Meeting strict installation deadlines to minimize operational disruptions.
Solutions Provided
HIRS Global proposed a comprehensive solution tailored to meet the project’s requirements:
- Custom System Selection: Designing a weighbridge specifically for the needs of the Ministry, ensuring it meets all operational demands.
- Integration Plans: Developing strategies to integrate the weighbridge with current logistics and management systems without causing interruptions.
- Robust Installation: Utilizing protective measures and durable materials to ensure longevity and reliability in challenging environments.
- Training and Support: Offering extensive training for operational staff and ongoing maintenance support to ensure smooth functionality.
Results and Benefits
The successful deployment of the heavy-duty industrial weighbridge yielded several significant benefits:
- Enhanced Operational Efficiency: Streamlined weighing processes reduced waiting times for vehicles.
- Reduced Material Losses: Increased accuracy minimized discrepancies in weight measurements, leading to cost savings.
- Regulatory Compliance: The system ensured adherence to industry regulations regarding material handling.
- Long-Term Cost Savings: Improved efficiency and accuracy contributed to substantial long-term financial benefits for the Ministry.
Conclusion: The implementation of HIRS Global’s heavy-duty industrial weighbridge at the East Gate quarry site effectively addressed the Ministry of Mining’s challenges in weighing moving sand and stones. This project not only enhanced operational efficiency and accuracy but also significantly improved safety standards at the site. By delivering a tailored solution that integrates seamlessly with existing systems, HIRS Global demonstrated its commitment to innovation and customer satisfaction, paving the way for operational excellence in the mining sector.